Challenge
Smart Citizens solution
Devices and systems installed
- Sub-metering on BOH circuits
- Demand-aware setbacks
- Daily engineering report
Integration
Outcome
Estimated benefit
Before
Single bulk meter, no visibility into BOH drivers.
After
Per-area visibility with daily exceptions reported.
