Skip to content
Engineering standardExpertUpdated 2026-07-08

Smart Home Documentation Standard

What every Smart Citizens project must document, in what format, and where it lives for the next ten years.

Executive summary

The essentials

  • Every project generates a standard document set
  • All artefacts stored in the Smart Citizens portal, indexed by site
  • Customer receives a printable runbook at handover
  • Every document is bilingual for customer-facing content

Purpose

Ensure institutional memory of every install survives staff changes and passes to the customer in usable form.

Scope

All Smart Citizens residential and commercial deliveries.

Design principles

Principle 1

Single source of truth — the portal, not a personal drive

Principle 2

Bilingual for customer-facing content

Principle 3

Machine-readable where possible (CSV, JSON) alongside PDF

Principle 4

Versioned with the same tag as the site controller

Engineering requirements

Engineering requirements

Mandatory requirements
  • Standard folder structure per site
  • PDF + source file for every drawing
  • CSV for every device inventory
  • Bilingual customer runbook
  • Handover certificate signed by owner

    Best practices

    Templates

    Templates: Use only the approved Smart Citizens templates

    Naming

    Naming: Files follow site-code_document-code_YYYY-MM-DD.ext

    Access

    Access: Owner and property manager receive portal accounts at handover

    Installation workflow

    Installation workflow

    Delivery

    How it works

    1. 1. Create site folder

      Provision the portal folder structure from the template.

    2. 2. Upload design set

      Signed drawings uploaded before mobilisation.

    Configuration & programming workflow

    Configuration & programming workflow

    Delivery

    How it works

    1. 1. Populate inventory

      Device inventory CSV maintained live during install.

    2. 2. Update as-built

      Drawings updated within 48 h of any field change.

    Commissioning steps

    Commissioning steps

    Delivery

    How it works

    1. 1. Attach evidence

      Every commissioning artefact filed under /commissioning.

    2. 2. Publish runbook

      Bilingual customer runbook generated and reviewed.

    Validation checklist

    Validation checklist

    Validation checklist (must do)
    • All required documents present
    • Bilingual runbook uploaded
    • Handover certificate signed
    Common mistakes
    • Storing files on a laptop
    • Skipping AR runbook
    • Un-versioned drawings

    Quality assurance checklist

    Folder completeness

    Every mandatory folder contains its expected artefacts.

    Runbook review

    Runbook reviewed by an engineer not on the project team.

    Acceptance criteria

    Acceptance criteria
    FeatureTargetVerification methodPriority
    Portal folder populated
    100% of mandatory documentsPortal audit reportHigh
    Handover certificate signed
    YesOwner signature recordHigh
    Acceptance criteria

    Risk matrix

    Risk matrix
    FeatureLikelihoodImpactMitigation
    Documents on a personal drive
    MediumHighPortal-only rule; monthly audit
    Risk matrix

    Common mistakes & troubleshooting

    Troubleshooting tips

    Delivery

    How it works

    1. Missing artefact at audit

      Regenerate from the site controller export; upload immediately.

    Documentation requirements

    Documentation requirements

    Documentation deliverables
    • Installation drawing set (PDF + source)
    • Cable schedule (CSV)
    • Device inventory (CSV + JSON)
    • IP addressing plan
    • Commissioning report (PDF)
    • Customer runbook (PDF, EN + AR)
    • Handover certificate (PDF, signed)

      Maintenance timeline

      Maintenance timeline

      Delivery

      How it works

      1. After every change

        Update relevant document within 48 h and re-publish.

      2. Annually

        Portal audit to confirm nothing has drifted.

      Version & change log

      Version 1.0

      Approval status: Approved · Effective date: 2026-01-15 · Last revision: 2026-07-08

      Author / Reviewer

      Author: Smart Citizens Engineering · Reviewer: Dr. Ashraf Nouri

      Change log

      v1.0 — 2026-07-08

      Initial published edition. (Smart Citizens Engineering)

      Frequently asked questions

      FAQ

      Frequently asked questions

      Does the customer own the documents?

      Yes — all customer-facing documents are licensed to the property owner for the life of the system.

      Where are the drawings stored?

      In the Smart Citizens customer portal under the site's Documents folder.

      Official citation
      How to cite
      Suggested citation
      Smart Citizens Engineering. "Smart Home Documentation Standard." Smart Citizens, 2026-01-15. https://ai.smartcitizens.ae/standards/documentation-standard.
      Smart Citizens Engineering (2026). Smart Home Documentation Standard. Smart Citizens. Retrieved 2026-07-23, from https://ai.smartcitizens.ae/standards/documentation-standard
      CategoryEngineering Standard
      AuthorSmart Citizens Engineering
      PublisherSmart Citizens
      Published2026-01-15
      Last updated2026-07-08
      VersionPlaceholder-ready
      Language
      en
      LicenseCC BY-NC 4.0 (unless noted)
      DOIPlaceholder-ready

      Design your smart environment with Smart Citizens

      Talk to Smart Citizens engineers for a bespoke design, budget estimate, and rollout roadmap.