Commissioning

Commissioning methodology

The commissioning workflow that turns installed hardware into a coherent smart home.

Best practices

  • Two commissioning sessions minimum: pre-move-in and post-move-in
  • Every scene has a fallback (manual override)

Common mistakes

  • Programming scenes without the client present
  • Skipping the day/night double-check
  • Not logging the 30-day change requests

Engineering checklist

  • Pre-commissioning checklist signed by installer
  • Scenes tested in isolation before integration
  • Cross-system scenes tested at night and day
  • Owner walk-through recorded
  • Change log opened for the first 30 days

Recommended workflow

  1. Installer pre-commissioning
  2. Scene programming
  3. Day/night walk-through
  4. Owner training
  5. 30-day iteration
  6. Sign-off