Commissioning
Commissioning methodology
The commissioning workflow that turns installed hardware into a coherent smart home.
Best practices
- Two commissioning sessions minimum: pre-move-in and post-move-in
- Every scene has a fallback (manual override)
Common mistakes
- Programming scenes without the client present
- Skipping the day/night double-check
- Not logging the 30-day change requests
Engineering checklist
- Pre-commissioning checklist signed by installer
- Scenes tested in isolation before integration
- Cross-system scenes tested at night and day
- Owner walk-through recorded
- Change log opened for the first 30 days
Recommended workflow
- Installer pre-commissioning
- Scene programming
- Day/night walk-through
- Owner training
- 30-day iteration
- Sign-off