Challenge
Smart Citizens solution
Devices and systems installed
- Smart switches
- Occupancy sensors
- Scene engine
Integration
Outcome
Estimated benefit
Before
Lights left on in unoccupied rooms.
After
Occupancy-driven scenes with night-light paths.
Owner wanted to cut wasted lighting use in unoccupied rooms.
Lights left on in unoccupied rooms.
Occupancy-driven scenes with night-light paths.
Most lighting savings projects in Dubai are scoped during a free site visit. Typical timelines range from a few days for apartments to 3–6 weeks for large villas, depending on cabling and finishing trades.
For apartments we usually only need a standard NOC. For villas, retrofits typically don't need approvals. Smart Citizens handles paperwork where required.
Yes. All Smart Citizens-deployed devices are unified in the Smart Citizens App, with role-based access for owner, family members and staff.
Every project includes onboarding, a 3-year replacement warranty on Smart Citizens devices, and an optional AMC for ongoing support and tuning.
Get an AI-assisted Smart Citizens proposal or book a free site visit. Backed by the Smart Citizens 3-year replacement warranty.