Smart Retrofit — JLT Townhouse

Non-invasive smart-home upgrade for a 3-storey townhouse with zero wall opening.

Executive summary

The essentials

  • 75 devices installed with zero construction
  • Battery-powered door/window sensors throughout
  • No-neutral smart switches replaced existing plates
  • 20% cooling reduction via occupancy-aware AC control

Project overview

Project overview
FeatureDetails
Client
Family of Four (anonymised)
Area
Jumeirah Lake Towers, Dubai
Property type
3-storey townhouse
Timeline
4 weeks
Project overview

Customer objectives

Objective 1

Automate lighting, shading, and AC without construction

Objective 2

Integrate existing split ACs via IR

Objective 3

Add security sensors on all entry points

Existing conditions

Existing conditions

    Baseline conditions
    • Standard switches, no neutral
    • Wall-mounted split ACs
    • No existing smart devices

    Key challenges

    Key challenges

      Documented challenges
      • No neutral wire in most switch boxes
      • AC remotes varied by floor and brand

      Engineering analysis

      Engineering mapped all switch boxes; selected Aqara H1 no-neutral switches and Broadlink IR blasters per AC. Zigbee mesh extended via smart plugs acting as routers.

      Solution architecture

      Zigbee coordinator (SkyConnect) on Home Assistant mini-PC; no-neutral switches, battery sensors, and IR blasters form the device layer.

      Technologies used

      Technologies used

      Core platforms and technologies.
      • Zigbee· Mesh network
      • IR blasters· AC control

      Protocols used

      Communication protocols actually deployed.
      • Zigbee
      • Infrared

      Products & equipment

      Before & after

      Before & after
      FeatureBeforeAfter
      State
      Manual switches, basic AC remotes, no security sensors.App + voice control, scheduled AC, entry alerts.
      Before & after

      Project timeline

      Delivery

      How it works

      1. Week 1

        Survey, switch-box audit, equipment order.

      2. Week 2

        Switch and sensor installation.

      3. Week 3

        IR pairing, scene programming.

      4. Week 4

        QA, customer training, warranty handover.

      Project statistics

      0
      Devices installed
      0
      Walls opened
      0%
      Cooling reduction

      ROI summary

      Sustainability metrics

      Sustainability metrics

      Measured / targeted sustainability outcomes
      • Occupancy-aware AC saves ~4 kWh/day
      • Motion-dimmed lights cut standby energy

        Key engineering decisions

        No-neutral switches vs smart bulbs

        Switches preserve existing fixtures and dimming compatibility. — Trade-off: Limited switch styles available.

        Risk register

        Risk register
        FeatureRiskLikelihoodImpactMitigation
        Zigbee dead spots on roof terrace
        Zigbee dead spots on roof terraceMediumLowOutdoor smart plug as repeater.
        Risk register

        Lessons learned

        Lessons learned

        Lessons learned
        • Document every AC remote code before removing batteries
        • Battery sensors need annual replacement reminders

          Customer outcomes

          Outcome 1

          Family controls entire home from a single app

          Outcome 2

          Kids' room AC auto-off after bedtime

          Outcome 3

          Front door alerts via mobile push

          Future expansion opportunities

          Future expansion opportunities

          Expansion opportunities
          • Add smart lock when family is ready
          • Integrate robot vacuum for scheduled cleaning

            Project Intelligence Score (internal)

            Internal analytics only.

            0/10
            Technical complexity
            0/10
            Automation coverage
            0/10
            AI integration
            0/10
            Sustainability features
            0/10
            Documentation completeness
            0/10
            Engineering depth
            0/10
            Visual evidence
            0/10
            Customer outcome quality

            Frequently asked questions

            FAQ

            Frequently asked questions

            Do I need to repaint after install?

            No — all devices are surface-mounted or battery-powered.

            How long do batteries last?

            Typically 12–24 months depending on sensor activity.

            Official citation
            How to cite
            Suggested citation
            Smart Citizens Engineering. "Smart Retrofit — JLT Townhouse." Smart Citizens, 2026-07-08. https://ai.smartcitizens.ae/case-studies/story/jlt-townhouse-retrofit.
            Smart Citizens Engineering (2026). Smart Retrofit — JLT Townhouse. Smart Citizens. Retrieved 2026-07-24, from https://ai.smartcitizens.ae/case-studies/story/jlt-townhouse-retrofit
            CategoryCase Study
            AuthorSmart Citizens Engineering
            PublisherSmart Citizens
            Published2026-07-08
            Last updated2026-07-08
            VersionPlaceholder-ready
            Language
            en
            LicenseCC BY-NC 4.0 (unless noted)
            DOIPlaceholder-ready

            Design your smart environment with Smart Citizens

            Talk to Smart Citizens engineers for a bespoke design, budget estimate, and rollout roadmap.